New Laboratory and Assembly Facility

Increasing demand for custom-built equipment and the need to accommodate an expanding array of demonstration and trial equipment was making life very difficult in our old lab/assembly unit in Denton near Manchester.  From November 2011, we moved into a brand new industrial unit in Hadfield, Derbyshire, with 175 sq.m of floor space and a roof height of 7m.  Being only a few minutes drive from our Glossop offices, the move has also made the link between the two sites much stronger and will improve efficiency in operations.

The new facility has a small workshop and larger, clean assembly area and materials stores.  Dry and wet equipment testing and customer trial areas are separated from the engineering areas by an internal wall and allow customer projects and trial work to proceed  alongside each other without compromising confidentiality.

To discuss your mixing requirements or book a trial, please contact us.

 

This entry was posted in News. Bookmark the permalink.

Comments are closed.